Concrete Calculator

About this calculator

The Concrete Calculator estimates how much concrete a pour needs for a slab, square footing or wall, a round hole or column, a circular slab or tube, a curb and gutter run, or a set of stairs. Enter dimensions for a volume estimate, or choose Measured Area / Bag Order to calculate whole bags using the yield on your mix label.

Enter 0 if your measured area already includes the allowance you want.
Use the volume printed on the mix packaging.
Embed this calculator

Paste this code into a Custom HTML block on your site. The calculator fits the width of the block. Adjust the height in the code if you want more room for results.

Find this widget in the publisher directory

Turn a volume estimate into an order

The calculator gives the geometric volume and weight-based bag equivalents. It does not automatically add an allowance for waste or uneven ground. Decide on an allowance for your project, then check the yield on the exact mix you plan to buy before rounding up to whole bags.

For a 10 ft by 10 ft pad at 4 inches thick, the base volume is 33.33 ft³, or about 1.23 yd³. An illustrative 10% allowance gives 36.67 ft³, or 1.36 yd³. The QUIKRETE Concrete Mix No. 1101 data sheet lists approximately 0.60 ft³ per 80 lb bag. At that yield, divide the unrounded ordering volume by 0.60 and round up: 62 bags. The 10% allowance is an example, not a requirement for every project.

To reproduce this order, choose Measured Area / Bag Order and enter 100 ft², 4 inches, 10% and 0.60 ft³ per bag. If you know the surface dimensions, calculate them in the Area Calculator and choose Use this area in Concrete. The measured-area mode assumes uniform thickness. Use the gravel calculator for a separate aggregate layer; concrete and gravel need their own depths and quantities.

How much concrete do I need?

Concrete is bought by volume, so every estimate comes down to one question: how many cubic yards (or cubic meters) of space will the wet mix fill? Measure the form, convert all dimensions to the same unit, apply the volume formula for the shape, and then add a margin for spillage, uneven subgrade and form bulge. Most contractors order 5 to 10 percent more than the calculated volume, because running short in the middle of a pour leaves a cold joint that weakens the finished slab.

Volume formulas by shape

Slabs, square footings and walls

Volume = length × width × thickness

This covers patios, driveways, shed bases, square pier footings and poured walls. Thickness is usually given in inches, so remember to divide by 12 before multiplying by feet.

Holes, columns and round footings

Volume = π × (diameter ÷ 2)² × depth

Use this for post holes, sonotube piers and round footings.

Circular slabs and tubes

Volume = π ÷ 4 × (outer diameter² − inner diameter²) × height

A hollow tube or ring footing subtracts the inner circle from the outer one. Set the inner diameter to zero for a solid round slab.

Curb and gutter barriers

Volume = [curb depth × (curb height + flag thickness) + gutter width × flag thickness] × length

The curb is the raised lip, and the flag is the flat gutter pan in front of it. The curb portion runs the full height from the bottom of the flag to the top of the curb.

Stairs

Concrete steps are treated as a stack of blocks. Each of the first n − 1 steps is one run deep and as tall as the number of rises below its top. The top step is a platform that is as tall as all n rises combined.

Volume = width × [run × rise × (1 + 2 + … + (n − 1)) + platform depth × rise × n]

Worked example

A 10 ft by 10 ft patio poured 4 inches thick has a volume of 10 × 10 × (4 ÷ 12) = 33.33 cubic feet. Divide by 27 to get 1.23 cubic yards, or about 0.94 cubic meters. At 133 lb per cubic foot of pre-mixed concrete it weighs about 4,433 lb, which is 4,433 ÷ 80 = 55.42, so you would buy 56 bags of 80 lb mix, or 4,433 ÷ 60 = 73.89, rounded up to 74 bags of 60 lb mix. With an illustrative 10 percent waste allowance, use the unrounded volume to get about 1.36 cubic yards.

Example bag yields: QUIKRETE Concrete Mix

Bag sizeApproximate published yieldWhole bags for 1 yd³ before allowance
40 lb0.30 ft³90
60 lb0.45 ft³60
80 lb0.60 ft³45

These example yields come from the QUIKRETE Concrete Mix product data sheet, checked November 6, 2026. They are approximate and specific to that product, not every concrete mix. Whole-bag quantities above use 27 ft³ per yd³ divided by the published yield, rounded up.

The calculator uses a separate weight-based method: it converts volume to weight at 133 lb per cubic foot (2,130 kg per cubic meter), then divides by the bag weight. Those weight-based equivalents can differ from a manufacturer’s published yield. Yields vary slightly by brand and mix design, so check the bag label.

Concrete weight

Bagged pre-mixed concrete weighs about 133 pounds per cubic foot, or roughly 3,590 pounds per cubic yard (about 2,130 kg per cubic meter). Normal-weight structural concrete from a ready-mix plant is denser, around 145 to 150 pounds per cubic foot. The weight matters when you plan how to haul bags, whether a trailer can carry the load, and how much a suspended slab adds to the structure below it.

Bags or ready-mix?

Bagged concrete makes sense for small jobs: fence posts, a few footings, or a small pad up to roughly half a cubic yard. Beyond about one cubic yard, mixing dozens of heavy bags by hand becomes slow and makes it hard to keep the pour consistent. Ready-mix trucks deliver a uniform batch, and many suppliers sell short loads for a fee. Get a quote both ways for anything between half a yard and two yards.

Tips for an accurate estimate

  • Measure the actual form, not the plan. Forms often end up slightly larger than drawn.
  • Check the subgrade. A low spot one inch deep across a 100 square foot slab adds more than 8 cubic feet.
  • Round thickness up, not down, when the base is uneven.
  • Order a little extra. Leftover concrete can fill a post hole or splash block, but a shortage cannot be fixed later without a seam.

Frequently asked questions

How many bags of concrete do I need for a 10x10 slab?
At 4 inches thick, a 10 by 10 ft slab is 33.33 cubic feet (1.23 cubic yards). At 133 lb per cubic foot that is about 4,433 lb of mix: 55.4 bags of 80 lb (buy 56) or 73.9 bags of 60 lb (buy 74), before any waste allowance.
How many 80 lb bags make a yard of concrete?
A cubic yard of pre-mix weighs about 27 × 133 = 3,591 lb, so it takes about 44.9 bags of 80 lb mix (buy 45) or 59.9 bags of 60 lb mix (buy 60).
How much does a yard of concrete weigh?
Bagged pre-mix weighs about 133 lb per cubic foot, so a cubic yard is about 3,591 lb. Normal-weight ready-mix at 150 lb per cubic foot comes to about 4,050 lb, just over 2 tons.
How much extra concrete should I order?
Add 5 to 10 percent to the calculated volume to cover spillage, an uneven base and form movement. Use the upper end for irregular or hand-dug forms.

Formulas and sample results on this page were checked against independent references. Page last reviewed or updated . How we verify calculators. Project led by Shaun Connell.